Why is PESO licensing central, and what does it cover?
sourced
PESO, under the SMPV rules, licenses high-pressure storage and handling of compressed gas at 250 bar - which makes it the most safety-critical regulatory dimension of a CBG plant. It rewards early specialist engagement at the engineering stage, because a late PESO submission moves the commissioning date directly.
- Source
- IMARC Engineering; Corpzo
- sourced
- Traceable to a named source.
- Level
- Practitioner — Operating numbers, ranges and failure modes.
Where this shows up while you build
This answer is attached to the controls it explains, so it appears beside them in the builder rather than only here.
Read next